City of South Pasadena Facebook South Pasadena Public works tiwittle South Pasadena Nixle South Pasadena Police Facebook South Pasadena Police Twitter South Pasadena Police Youtube Newsletter sign up


Home > Departments > Transportation > Orange Grove Avenue
 
 
 

Project Description:

This project's three main goals are to:
1) Eliminate back-up on the 110 Freeway at the Orange Grove off-ramp;
2) Improve traffic safety on southbound Orange Grove Avenue as it approaches the freeway; and
3) Improve pedestrian safety along Orange Grove Avenue.

The improvements include the installation of a landscaped median that greatly increases traffic safety. Traffic signals have been installed at the Orange Grove Avenue on-and-off ramps on the north and south sides of the 110 freeway. As a result, congestion has been reduced on both the 110 freeway ramps and Orange Grove Avenue.

Sidewalks along Orange Grove Avenue (from the 110 freeway to Columbia Street) have been improved and vintage street lights have been installed to provide greater pedestrian safety.